DTG Mech Services handed over to Metro North the upgrade of air cooled chillers and associated Pumps and MSSB at Brighton Health Campus.
- Replacement of the existing PowerPax Chillers with new two (2) x 600 kw Smardt Chillers;
- Supply and install five (5) x Chilled Water Pumps;
- Clean-out and refurbishment of Buffer Vessel;
- Removal of existing MSSB and replace with new upgraded MSSB;
- Upgrade of existing BMS control software to current generation interface software.
All work undertaken in a staged manner to ensure that chilled water was maintained to the campus at all times.
DTG wish to extend many thanks to Metro North and Stantec for their assistance in delivering this project along with our loyal and trusted trade partners.